From Module 01 · The Idea to Unit Economics
Landed cost: how to calculate what one unit really costs.
Landed cost is what one finished unit of your product costs by the time it is on your shelf, ready to ship. It is your bill of materials plus inbound freight, setup charges, packaging, finishing and scrap. To calculate it, add those lines to your BOM and divide any per-run charges by the number of units in the run.
Most first-time makers price their product from the drawing. They add up the steel, the laser time, the bend, the powder coat and the bolts, then double it. That number is real, but it leaves out freight, setup, packaging and scrap. Small product companies lose margin in those missing lines without noticing.
The course example makes the point. Off-Road Design Co. sells a Tacoma A-pillar light mount for $179. At 100 units, the parts and processes on the drawing add up to $48. The full landed cost is $65. The $17 difference is a quarter of the real cost, and none of it shows up on the drawing.
Bill of materials versus landed cost
A bill of materials, or BOM, is the list of every part, process and package that goes into one unit, with a cost next to each line. It is the right place to start.
Landed cost is what one finished unit costs by the time it is on your shelf, ready to ship to a customer. It is the BOM plus everything it took to get the unit there.
BOM items often forgotten or ignored
These are the costs that rarely appear on a first BOM. Check every one for your product.
- Inbound freight. Getting raw material to the shop, parts to the coater, and finished parts to you.
- Setup and minimum charges. Laser programming, press brake setup, a powder coat batch minimum. At 100 units, these are a big share of each part.
- Finishing. Deburring, masking, rework and touch-up.
- The hardware kit. Bolts, washers, nuts, spacers, and the bag they go in.
- Packaging. The box, the foam or insert, the instructions, the label.
- Scrap and rejects. Parts that come back scratched, bent or out of spec. Plan for some.
Rule of thumb
If a line costs money every time you make a batch, it belongs in landed cost, even if the amount is $0 today. Keeping the row means a new charge shows up in your cost the day it starts.
How landed cost changes with volume
Setup charges and minimums get spread over more units as volume grows, and material and process prices drop at quantity breaks. Here is the course example at four volumes, at a $179 retail price.
| Units per run | Landed cost | Gross profit / unit | Gross margin |
|---|---|---|---|
| 100 | $65 | $114 | 64% |
| 500 | $48 | $131 | 73% |
| 1,000 | $38 | $141 | 79% |
| 10,000 | $31 | $148 | 83% |
Off-Road Design Co. light mount · course example · MSRP $179
A thin margin at 100 units is fine if you know it improves at volume and you price from the run you are actually ordering.
Landed cost calculator
Enter your own numbers. Setup and minimum charges are entered per run, so you can see what run size does to your cost. The fields start with the light mount example.
| Landed cost per unit | $65.00 |
| Not on the drawing | |
| Gross margin, your own site | 64% |
| Gross margin, dealer at 20% off | 55% |
| Gross margin, distributor at 40% off | 39% |
| Units to $100K in revenue | 559 |
Dealer and distributor discounts are ballpark midpoints, not rules. See wholesale vs retail price.
How to find your own landed cost
- Write the BOM: every part, process and package, one line each. Our free bill of materials template has the rows ready.
- Add the landed lines above, even the ones you think are zero.
- Get one real quote from a shop for the parts you cannot make yourself, and use the quoted price.
- Price it at four volumes: 100, 500, 1,000 and 10,000.
- Divide $100,000 by your retail price. That is how many units you need to sell to reach $100K in revenue. For the light mount it is 559.
Questions makers ask
How do you calculate landed cost?
Add up the BOM for one unit. Add inbound freight, packaging, finishing and scrap per unit. Divide setup and minimum charges by the units in the run and add that too.
What is included in landed cost?
Materials, parts and processes, inbound freight, setup and minimums, packaging, finishing and scrap. For imported goods, also duties, tariffs, customs and broker fees.
Is landed cost the same as cost of goods sold?
No. Landed cost is per unit, for pricing. Cost of goods sold is the landed cost of what you sold in a period, for your books. More in how to calculate cost of goods sold.
Module 01 of Bench to Brand walks through this line by line, with an Excel workbook that does the math at all four volumes and a filled example for the light mount.